FTS UK public procurement

Supply and Installation of addition solar PV panel generation system

University of Salford

CompleteOCDS ID ocds-h6vhtk-065665
Tender valueNot supplied1 awards · 0 contracts

01 Procurement

Tender overview

Updated 21 April 2026
Buyer
University of Salford
Status
Complete
Procurement method
Below threshold - open competition
Category
works
CPV classification
Not supplied
Tender period
Not supplied — 27 March 2026

Description

The University of Salford seeks proposals to supply and install additional PV generation to one of its buildings. The Northern Engineering Robotics Innovation Centre (NERIC) was constructed in 2022 for the University of Salford, the first building on its new Innovation Campus on Frederick Road, M6 6AP. At the time it was fitted out with 15 kWp onto its higher flat roof. The roof was originally designed to accommodate more panels, but these were reduced in a value engineering exercise. 2.0 Goods and Services to be provided The University seeks to double the amount by adding another 15 kWp bringing the total to 30kWp on the existing higher, gravel ballasted flat roof, easily visible from google satellite, while still maintaining access to service plant and the PV system. We can provide hourly data for 2025 for import, generation and export and would want a model worked up using this data as a basis but on double the existing building consumption (c55,000 kWh/yr to 110,000kWh/yr) as we are expecting this to rise very shortly. Modelling should show generation, import, export, costs saved over 20-year period as a minimum, carbon saved using current grid carbon intensity, payback periods etc including inverter replacement at year 10. Work on a current electricity import price of 28p/kWh and a grid (import) carbon intensity of 177g CO2e/kWh and an export price of 5.6p/kWh Can you please provide us with a proposal and quote to include. • A cost/carbon/payback model based on the above parameters. • A rough breakdown of costs in your quote rather than a single figure. • Provide the data sheets for the proposed panels, non-penetrating fixing system and inverters. • The combined panel/fixing weight as kg/m2 as installed on the roof. • State the panel and inverter warranty. If it doesn't already have it, the inverter should have a minimum 10-year warranty. • The generation meter provided or utilising the existing one will need to be linked to our BMS system. • How and where you intend to lift the panels and fixings onto the roof. • Provide a separate option for battery storage, it's price and impact on export. • You would be expected to carry out all the liaison for approvals with the DNO. • Comply with the University's standard T&Cs for this type of electrical work. • Two references with contact details for similar systems you have installed.

i

This page represents one OCDS contracting process. Notices can be revised over time. Values may be estimates, award values or contract values and should be read with their displayed stage and date.

02 Awards and contracts

Published award records

1 shown
Active

Supply and Installation of addition solar PV panel generation system

Awarded
19 April 2026
Award value
£20,116.65
Suppliers
1
Signed contract
Not supplied

03 Organisations

Buyers, suppliers and other parties

2 parties
Buyer

University of Salford

43 The Crescent, Salford, UKD34, M5 4WT, United Kingdom

GB-CHC RC000666

Companies House links appear only for explicit GB-COH identifiers. BritDB does not create company links from a similar name or address.

04 Provenance

Source for this process

Contains public sector information licensed under the Open Government Licence v3.0. Official external links are available only on the source transition page.