FTS UK public procurement

Supplier funded renewables for Traction (DC DPPA framework)

NETWORK RAIL INFRASTRUCTURE LIMITED

PlanningOCDS ID ocds-h6vhtk-06a2c1
Tender value£125,000,0000 awards · 0 contracts

01 Procurement

Tender overview

Updated 5 June 2026
Buyer
NETWORK RAIL INFRASTRUCTURE LIMITED
Status
Planning
Procurement method
Not supplied
Category
goods
CPV classification
Not supplied
Tender period
Not supplied — Not supplied

Description

Background Network Rail owns, operates and maintains Great Britain’s railway infrastructure, including track, signalling, electrification systems, bridges and stations. As one of the largest electricity consumers in the UK, Network Rail uses approximately 4.5 TWh per annum (c.4.1 TWh traction and 0.45 TWh non-traction). In support of the UK Government’s Net Zero by 2050 commitment, Network Rail is seeking to transition its electricity supply towards renewable sources. Scope of Opportunity Network Rail’s electrified network includes: • 25 kV AC overhead line systems • 750 V DC third rail systems (Southern Region and Merseyrail) This procurement relates exclusively to the 750 V DC third rail network. The Southern Region DC traction power system comprises: • ~40 grid connection points supplied by Distribution Network Operators (DNOs) • A 33 kV (predominantly) three-phase distribution network, with limited 11 kV sections • Around 300 substations with transformer rectifier units converting AC to 750 V DC • A highly variable load profile driven by train operations • Network control via SCADA systems from electrical control rooms Opportunity Description Network Rail is exploring opportunities to integrate renewable energy generation “behind the meter”, directly connected to its 33 kV distribution network to supplement existing DNO supplies. An export limitation scheme will be implemented to prevent excess energy being exported to the grid. The intent is to procure energy through a Direct Power Purchase Agreement (DPPA) under a supplier-funded model. Supplier Requirements Network Rail is seeking expressions of interest from organisations that can demonstrate: • Proven capability in renewable generation development covering various technologies (e.g. solar, wind, storage, or hybrid solutions) • Experience with private wire / behind-the-meter connections and Power Purchase Agreements • Strong technical expertise in high-voltage integration (33 kV or similar) • Sufficient financial capacity to deliver a pilot scheme and support potential wider rollout • Ability to work within operational railway constraints Programme • Pilot project to be developed as an initial phase • Subject to success, potential rollout across the wider DC traction network of up to 40GWh p.a • Procurement launch anticipated: August 2026 • This will be a single supplier Framework. Next Steps Interested parties should submit an expression of interest via email to: nikki.hunter@networkrail.co.uk

i

This page represents one OCDS contracting process. Notices can be revised over time. Values may be estimates, award values or contract values and should be read with their displayed stage and date.

02 Awards and contracts

Published award records

0 shown

No award object is present in this compiled process yet.

03 Organisations

Buyers, suppliers and other parties

1 parties
Buyer

NETWORK RAIL INFRASTRUCTURE LIMITED

Waterloo General Office, London, UKI45, SE1 8SW, United Kingdom

GB-PPON PNZN-9524-VCQJ

Companies House links appear only for explicit GB-COH identifiers. BritDB does not create company links from a similar name or address.

04 Provenance

Source for this process

Contains public sector information licensed under the Open Government Licence v3.0. Official external links are available only on the source transition page.