FTS UK public procurement

NRW All Wales Mountain Bike Trail and Maintenance Framework

Natural Resources Wales

PlannedOCDS ID ocds-h6vhtk-06ba93
Tender value£2,000,0000 awards · 0 contracts

01 Procurement

Tender overview

Updated 23 June 2026
Buyer
Natural Resources Wales
Status
Planned
Procurement method
Open procedure
Category
works
CPV classification
Not supplied
Tender period
Not supplied — Not supplied

Description

NRW intends to award a Framework Agreement to support the maintenance of over 500km official NRW mountain bike trails across Wales. The Framework contains two separate Lots, each divided further into geographical sub-Lots. Lot 1 – Mountain Bike Trail Maintenance Works Lot 1 covers the preventative and reactive maintenance activities identified through the regular trail inspection programme. The specification of works includes, but is not limited to: • Maintenance of mountain bike trail tread, trail chassis and trailside features, including de-berming, culvert repairs, ditch clearance, grade dip repairs, and repairs to trail tread and chassis using hand tools, whacker plates, powered wheelbarrows and other plant and equipment as required. This also includes clearance of fall zones and maintenance of the wider trail corridor. • Maintenance of trail corridors and sightlines through vegetation management, including cutting back encroaching vegetation and brashing trailside trees flush to the trunk. • Small-scale installation, maintenance and repair of fencing and motorcycle barriers. Detailed specifications for all works will be agreed in advance between the Contractor and the Lot Manager. • Installation, maintenance and replacement of waymarker posts, interpretation panels, signage and other associated trailside infrastructure. • Small-scale chemical treatment and manual control of weeds and invasive species within car parks and along trail networks. Chemical use must be kept to a minimum, with manual clearance being the preferred method wherever practicable. Written approval from the Project Manager must be obtained prior to any chemical application, including approval of the products to be used and the proposed application method. Chemical usage records and data sheets must be provided by the Contractor following completion of spraying activities. • Emergency call-out works, including outside normal working hours (09:00–17:00, Monday to Friday), for repairs, maintenance activities, route diversions and other urgent operational requirements. Lot 2 – Mountain Bike Trail Design and Construction Lot 2 covers the design and construction of new mountain bike trails and trail sections to the grades specified by the Client. Detailed project-specific requirements will be provided for each commission; however, the scope is expected to include: • Detailed trail design. • Securing all necessary permissions, approvals, consents and licences required for project delivery. • Corridor clearance and construction of trails to the specification and grading requirements defined by the Client. • Testing, commissioning and certification that the completed works are fit for purpose. • Formal handover of completed trails and associated documentation to the Client.

i

This page represents one OCDS contracting process. Notices can be revised over time. Values may be estimates, award values or contract values and should be read with their displayed stage and date.

02 Awards and contracts

Published award records

0 shown

No award object is present in this compiled process yet.

03 Organisations

Buyers, suppliers and other parties

1 parties
Buyer

Natural Resources Wales

Welsh Government Offices Cathays Park, Cardiff, UKL22, CF10 3NQ, United Kingdom

GB-PPON PBBR-3628-MPRN

Companies House links appear only for explicit GB-COH identifiers. BritDB does not create company links from a similar name or address.

04 Provenance

Source for this process

Contains public sector information licensed under the Open Government Licence v3.0. Official external links are available only on the source transition page.