01 Procurement
Tender overview
- Buyer
- The Mayor and Commonalty and Citizens of the City of London
- Status
- Active
- Procurement method
- Competitive flexible procedure
- Category
- works
- CPV classification
- Not supplied
- Tender period
- Not supplied — Not supplied
Description
Glass Systems and Envelope — Barbican Renewal Programme. This is a bespoke glazed envelope design-and-build package, not new-build construction, on a part Grade II listed and Heritage sensitive building – The Barbican Arts Centre. The works comprise new glazed envelope and façade systems to the Conservatory and Stair 8, following directly behind the demolition (by others), which removes the existing glazing first. The package includes primary steel structure to the Conservatory and Terrace, and the façade access/maintenance walkway and associated gutters and louvres. The scope of works includes: - Conservatory roof and vertical glazing: louvres, vents, perimeter benches, insulation, aluminum paneling, doors and associated gutters, including the Arid House. - Steel structure relating to Conservatory glazing: primary steel structure supporting the Conservatory roof and vertical glazing systems, carried within this package's own Contractor Design Portion. - Conservatory Lantern: re-glazed roof lantern. - Conservatory Roof lights: Level 02 office roof lights and associated overhead glazing. - Garden Room glazing, doors and associated gutters: refurbished steel framing to Lakeside Terrace with new acoustic double glazing/doorsets, overhead and Conservatory-facing glazing, and plant-room gutter louvre/infill system. - Conservatory Terrace Glazing and Steel: new Level 04 enclosure — bespoke steel T-profile vertical glazing, matching overhead glazing, and the Terrace's primary steel structure and roof steelwork. - Sculpture Court Roof lights: new roof lights, scope to be developed with the Architect and Façade Engineer. - Stair 8 glazing and associated structure, louvres and gutters: crown/roof glazing on new external primary steel RHS mullions, planters glazing renewal, automated opening windows, exoskeleton mullion replacement (this package's own CDP), and crown mechanical louvres. - Visual and performance mock-ups: façade and propagation bench, Conservatory Terrace and Fly tower infill glazing visual mock-ups, plus off-site performance mock-ups covering roof and façade weather-resistance to CWCT Sequence A methodology. - Facade access and associated maintenance walkway: including the Conservatory Terrace mesh walkway and fascia panel.
This page represents one OCDS contracting process. Notices can be revised over time. Values may be estimates, award values or contract values and should be read with their displayed stage and date.
02 Awards and contracts
Published award records
No award object is present in this compiled process yet.
03 Organisations
Buyers, suppliers and other parties
The Mayor and Commonalty and Citizens of the City of London
PO Box 270, City of London, UKI43, EC2P 2EJ, United Kingdom
GB-PPON PYQD-1693-MYXRCompanies House links appear only for explicit GB-COH identifiers. BritDB does not create company links from a similar name or address.
04 Provenance
Source for this process
Contains public sector information licensed under the Open Government Licence v3.0. Official external links are available only on the source transition page.