01 Procurement
Tender overview
- Buyer
- Merseytravel
- Status
- Complete
- Procurement method
- Below threshold - limited competition
- Category
- Not supplied
- CPV classification
- Not supplied
- Tender period
- Not supplied — Not supplied
Description
The purpose of this commission is for the Contractor to undertake a feasibility study and cost analysis including anticipated return on investment providing a detailed report focusing on: • The reuse of tunnel sump water for tunnel wall washing. • The reuse of building roof and waste water for flushing building toilets and use in sinks and showers. The Contractor shall undertake the feasibility study following RIBA stages: • RIBA stage 0 - Strategic Definition. • RIBA stage 1 - Preparation and Briefing. • RIBA stage 2 - Concept Design. The feasibility study shall consider the reuse and filtration of sump water to current safe water quality standards considering the production requirements of the tunnel washing operations
This page represents one OCDS contracting process. Notices can be revised over time. Values may be estimates, award values or contract values and should be read with their displayed stage and date.
02 Awards and contracts
Published award records
LCRCA Consultancy Agreement - Water & Filtration
- Awarded
- Not supplied
- Award value
- Not supplied
- Suppliers
- 1
- Signed contract
- 9 September 2026
03 Organisations
Buyers, suppliers and other parties
Merseytravel
1 Mann Island, Liverpool, UKD72, L3 1BP, United Kingdom
GB-PPON PJQR-8469-DXQDAECOM LIMITED
Aldgate Tower, London, UKI42, E1 8FA, United Kingdom
Companies House 01846493 →Companies House links appear only for explicit GB-COH identifiers. BritDB does not create company links from a similar name or address.
04 Provenance
Source for this process
Contains public sector information licensed under the Open Government Licence v3.0. Official external links are available only on the source transition page.