HSE Enforcement record

Iver Construction Limited

Notice · 25 March 2025

Enforcement details

Reference
ENF-001652-25032025
Record type
Notice
Action date
25 March 2025
Result or notice type
Improvement notice
Offence or breach
That you have failed to provide facilities which comply with the requirements of schedule 2 throughout the construction phase of this project, as you have failed to provide suitable and sufficient washing facilities, so far as is reasonably practicable, at readily accessible places which are kept in a clean and orderly condition and which includes a supply of clean hot or warm running water and a rest room or area equipped with an adequate number of tables and seating with backs for the number of persons at work likely to use them at any one time and a means for boiling water e.g., a kettle. Compliance Date: 2025-05-05 Result: Not Complied With Acts or Regulations Breached: Construction (Design and Management) Regulations 2015, 13 / 4(c); Health and Safety at Work etc Act 1974, 3 / 1; Health and Safety at Work etc Act 1974, 2 / 1
Offence address
131High Street, West Drayton, London, UB7 7QL, England
Recipient postcode
SL0 0QD
Region
London
Local authority
Hillingdon
Industry
Construction
Main activity
41202 - Construction of domestic buildings
Type of location
Fixed
!

An enforcement-list record must be read in its official context. Verify the current HSE detail page before relying on outcome, status or monetary fields.