Enforcement details
- Reference
- ENF-001150-27012025
- Record type
- Notice
- Action date
- 15 January 2025
- Result or notice type
- Prohibition Notice Immediate
- Offence or breach
- As a principal contractor you have failed to plan, manage and monitor the construction phase and coordinate matters relating to health and safety during the construction phase to ensure that, so far as is reasonably practicable, construction work is carried out without risks to health and safety, as workers may be exposed via inhalation to asbestos fibres as a refurbishment and demolition survey of all work areas has not been conducted. Acts or Regulations Breached: Construction (Design and Management) Regulations 2015, 13 / 1; Control of Asbestos Regulations 2012, 5 / 1
- Offence address
- 1, Balham Road, London, N9 7AE, England
- Recipient postcode
- RM3 7HD
- Region
- London
- Local authority
- Enfield
- Industry
- Construction
- Main activity
- 41202 - Construction of domestic buildings
- Type of location
- Fixed
!
An enforcement-list record must be read in its official context. Verify the current HSE detail page before relying on outcome, status or monetary fields.