Enforcement details
- Reference
- ENF-004647-30042026
- Record type
- Notice
- Action date
- 21 April 2026
- Result or notice type
- Improvement notice
- Offence or breach
- That you have failed to provide welfare facilities required for construction sites which comply with the requirements of Schedule 2 throughout the construction phase of this project, as you have not provided suitable and sufficient washing facilities with a supply of clean hot and cold or warm running water within the vicinity of the toilet or within the changing area/cabin. Compliance Date: 2026-05-25 Result: Complied With Acts or Regulations Breached: Construction (Design and Management) Regulations 2015, 13 / 4(C) and Schedule 2
- Offence address
- High Street, Hornchurch, RM11, England
- Recipient postcode
- RM14 3TS
- Region
- London
- Local authority
- Havering
- Industry
- Construction
- Main activity
- 41100 - Development of building projects
- Type of location
- Fixed
!
An enforcement-list record must be read in its official context. Verify the current HSE detail page before relying on outcome, status or monetary fields.