Enforcement details
- Reference
- ENF-002217-06062025
- Record type
- Notice
- Action date
- 8 May 2025
- Result or notice type
- Prohibition Notice Immediate
- Offence or breach
- As a principal contractor you have failed to plan, manage and monitor the construction phase and coordinate matters relating to health and safety during the construction phase to ensure construction work is carried out without risk to health, as you have allowed work to be conducted what's liable to expose workers to asbestos, as a suitable and sufficient assessment as to whether asbestos is liable to be present was not conducted before work began, such as via a refurbishment and demolition asbestos survey conducted by a competent person. Acts or Regulations Breached: Construction (Design and Management) Regulations 2015, 13 / 1; Control of Asbestos Regulations 2012, 5 / -
- Offence address
- Grosvenor Crescent, Uxbridge, UB10, England
- Recipient postcode
- HA5 4FG
- Region
- London
- Local authority
- Hillingdon
- Industry
- Construction
- Main activity
- 41100 - Development of building projects
- Type of location
- Fixed
!
An enforcement-list record must be read in its official context. Verify the current HSE detail page before relying on outcome, status or monetary fields.