Enforcement details
- Reference
- ENF-001125-20012025
- Record type
- Notice
- Action date
- 15 January 2025
- Result or notice type
- Prohibition Notice Immediate
- Offence or breach
- as principal contractor you have failed to plan, manage and monitor the construction phase and coordinate matters relating to health and safety during the construction phase to ensure that, so far as is reasonably practicable, construction work is carried out without risks to health or safety, as you have failed to take suitable and sufficient measures where workers carry out work at height, to prevent, so far as is reasonably practicable, any person falling a distance liable to cause personal injury, such as by ensuring that window openings and staircases within the construction site have barriers installed along open edges and by ensuring sub-contractors provide sufficient work equipment for preventing, so far as is reasonably practicable, a fall occurring during roof work e.g., a working platform complying with Schedule 3 of Work at Height Regulations 2005 (a mobile scaffold tower with edge protection). Acts or Regulations Breached: Construction (Design and Management) Regulations 2015, 13 / 1; Work at Height Regulations 2005, 6 / 3
- Offence address
- Cuckoo Hall Lane, London, N9, England
- Recipient postcode
- NW5 4BS
- Region
- London
- Local authority
- Enfield
- Industry
- Construction
- Main activity
- 41100 - Development of building projects
- Type of location
- Fixed
!
An enforcement-list record must be read in its official context. Verify the current HSE detail page before relying on outcome, status or monetary fields.